On this page
Projects
A project in KEPT is the unit of delivery: one client engagement, one body of knowledge, one set of commitments, one set of people.
The projects list
Projects shows everything your team currently owns and delivers. Each card shows:
The project name and client name.
The description.
The project status — Active, Paused, Completed, or Archived.
The owner, with an avatar.
How many tasks are active, plus blocker and commitment counts.
When the project last saw activity.
If you are a developer or QA, the page reads "Projects assigned to you" and only lists the projects you can access.
Two buttons appear for managers:
Import ZIP — go to Importing a Project.
New project — start the creation wizard.
Note
Project visibility is scoped. Owners, CEOs, admins, and managers see every project in the workspace. Team leads see their own assignments plus the projects of the teams they lead. Developers and QA see only the projects they are assigned to or own a task on. If a project you expect is missing, this is usually why.
Creating a project
Press New project. The wizard has four steps.
Step 1 — Client
"Who is this project for?" Fill in:
Client / company name — for example "Acme Corp".
Contact name — for example "John Smith".
Press + Create new client to create one inline, or ← Select existing client to pick one you already have.
Step 2 — Project details
Project name — for example "Mythos".
Description — optional, for example "What is this project?".
Step 3 — Context
"Project context" collects the facts KEPT uses to write accurate client replies later. Add one fact per line, for example "Uses React Native, deployed on AWS", and press + Add another fact.
Tip
Facts are the cheapest way to make AI replies accurate. Three or four real facts beat a long description every time.
Step 4 — Ownership
"Team" asks who works on this project. The note under the heading matters:
Ownership is visibility and access — it never creates tasks.
Primary owner — one person. Options are shown as "Name (role)".
Contributors — optional. Selected people are tagged Contributor.
The Summary card on the right shows the Client, Project, and Owner as you go.
Press Create Project when you are done.
The project cockpit
Every project has five tabs:
| Tab | What it holds |
|---|---|
| Overview | This week's work, open commitments, blockers, and the team. |
| Work | This week, ongoing, upcoming, and completed tasks. |
| Client | The conversation with the client and AI reply drafting. |
| Knowledge | Everything KEPT knows about the project. |
| Activity | The chronological audit trail. |
Overview
Three cards on the left:
This Week — the week range and a completed count, for example "Sep 28 – Oct 4" and "2 / 5 completed". Each row links to the task. Empty, it shows "No tasks planned for this week" with a Plan the week link.
Open commitments — each promise with its due date. Empty: "No open commitments."
Blockers — each blocker with "Waiting on {name}". Empty: "No active blockers."
On the right:
Team — the owner and contributors, labelled Primary Owner or Contributor. Empty: "No one assigned yet."
Review imported work — appears only if an import created auto-generated tasks that were never reviewed. It explains that they are not real work and offers to archive them in one click.
Work
"This week, upcoming, and completed. Old work stays out of the way." Four sections:
This Week · {range}
Ongoing — active work with no planned week.
Upcoming · from {range}
Completed — the ten most recent, with a strikethrough title.
Activity
A day-by-day timeline of everything that happened: task events, client messages, replies sent, commitments, blockers, day close, and GitHub evidence. It shows the most recent 50 events.
Assigning people to a project
Press Assign Project in the Overview tab (or the Team card).
Primary Owner — required.
Contributors — optional.
Press Save. The change is recorded as Project team assigned in the activity log.
Note
Assigning a project does not create workload. It grants visibility. Tasks are what create work.
Assigning work
Press Assign work in the project toolbar, or use the Assign work button on the Overview page, Weekly Plan, or a person's page.
The sheet asks for:
Project
Assign to
Task — for example "Complete authentication module".
Description — optional, "Instructions or details for this task".
Priority — Normal, High, or Urgent.
Due date — Today — complete this task, Tomorrow, or This week.
Press Assign. The assignee is notified, the task lands on their Today screen for the current week, and it appears on the Weekly Plan board.
Archiving imported tasks
Older imports created tasks automatically. If you see the Review imported work card, press Archive N imported tasks to cancel them in one click.
Note
Archiving only cancels the imported tasks. Project knowledge is untouched — the context you imported stays on the Knowledge tab.
Next
Tasks & Daily Updates — the task detail page and every action available on a task.
Project Knowledge — what KEPT knows about a project and how to read it.