Reporting
KEPT reports on execution rather than on productivity. There is no leaderboard, no hours log, and no per-person activity score. What exists is a set of counters, a status table, and a chronological record of what happened.
Execution statistics
The Overview page carries the Execution at a glance counters for the whole workspace:
| Counter | What it counts |
|---|---|
| Active | Every task that is active, blocked, or submitted. |
| Moving | Tasks that have actually started. |
| Not started | Assigned tasks nobody has opened. |
| Blocked | Tasks with an open blocker. |
| In QA | Tasks with an active QA task. |
| Need update | Active tasks with no recent update. |
| Overdue | Tasks past their due date that are not completed or cancelled. |
Need update and Overdue only appear when they are above zero, so a quiet team does not have to read past empty tiles.
You can filter the task list behind these numbers with the chips All, Attention, In Progress, Blocked, QA, and Overdue, and by person with the All people selector.
The Daily Brief
The Daily Brief at the top of Overview is a short AI summary of the day's execution. Press Generate brief to create it, Refresh to regenerate.
The brief reads the same counters and attention items that the page shows, so it never introduces facts the page does not have.
Note
The brief is a summary of the workspace's own records. It is not an assessment of people.
Team operating status
The People page reports per-person status in one row each:
| Column | Meaning |
|---|---|
| Check-in | Out, Closed, the check-in time, or Not in. |
| Active | "2/3 updated" — how much of their active work has today's update. |
| Planned This Week | How much work they are carrying this week. |
| Blocked | How many blockers they are holding. |
| Last Update | Their most recent update, truncated. |
This is the closest thing KEPT has to a team report, and it is deliberately an exception list rather than a ranking.
Activity timelines
Every project has an Activity tab showing the last 50 events, grouped by day. Event types cover:
Task lifecycle — created, assigned, reassigned, updated, blocked, completed, cancelled, seen, acknowledged, started, submitted.
Daily updates — task update, edited update.
Weekly planning — weekly plan created, weekly plan published.
Project and ownership — project created, project team assigned.
Client communication — client message received, client message linked to task, reply drafted, reply sent to client, commitment created, commitment met.
Accountability — blocker reported, blocker resolved, day closed, checked in, checked out, admin resolved.
External evidence — PR opened, PR merged, commits pushed.
QA — QA assigned, QA started, changes requested, QA resubmitted, QA passed.
Membership — organization created, user invited, invite accepted, role changed, user deactivated, team created, team lead assigned, team member added, team member removed.
The same events power each task's Activity panel and the Overview's Recent Activity list.
Per-person reporting
A person's record gives you the same information in one place: the Execution strip (Active, Moving, Blocked, In QA, Need update), their tasks, their projects, their open blockers, and their open commitments.
Commitments reporting
Open commitments appear on the project Overview with their due dates, on the Today screen, on each person's record, and as overdue items in the Inbox. They are the closest thing KEPT has to a client-facing delivery report.
What KEPT does not report
Worth stating plainly, because "reporting" usually implies these:
There is no export to CSV or PDF.
There is no date-range filter — all counters are for the current week or current state.
There is no per-person activity or productivity score.
There is no time tracking, and no record of hours, keystrokes, or screenshots.
There is no custom dashboard builder.
Note
KEPT records the reason for each run of the AI, including the model used, how long it took, and how many tokens it used. That data is stored for auditing, but there is no screen that reports on it.
Using the numbers honestly
A counter in KEPT is a statement about work, not about a person. "2/3 updated" means two of three tasks have today's update — it does not mean the third is not working. Escalations fire on silence, not on performance. That is deliberate: the system is designed to surface exceptions so a human can ask a question, not to answer questions on its own.